{"algorithm":"Ed25519","canonicalization":"JSON con chiavi ordinate (sort_keys), separatori compatti (',' ':'), ensure_ascii","payload":{"verdict_id":457,"claim_id":470,"claim_text":"If all 24 applications were approved, they will use up to 1 and 1/2 times our peak energy use for the whole of Scotland.","label":"vero","confidence":0.7,"explanation":"Analysis of the hyperscale data centre applications in the Scottish planning system found around 24 major proposals which, if all approved at requested capacity (~6,000 MW), would exceed 1.5 times Scotland's current total peak electricity demand. This matches the claim, though it is a projection based on applied-for capacity rather than confirmed build-out.","sources":[{"url":"https://www.ercs.scot/news/data-centres-in-the-scottish-planning-system-would-double-scotlands-energy-demands-press-release/","ente":"Environmental Rights Centre for Scotland (analysis of planning applications)","titolo":"Data centres in the Scottish planning system would double Scotland's energy demands","estratto":"24 proposals; if all approved (~6,000 MW) they would use more than 1.5 times Scotland's total peak power use."}],"issued_at":"2026-07-01T07:59:48+00:00"},"signature_b64":"XR3rlho/55YaU/Bx/6bQm5bZ2z2Rt9IihjHBrWZ7XC/tGxjwdINLBIhM8CUJWjWXPsFw3jX7m83mCRkWlg9jAw==","public_key_hex":"1719e2638a2cc0ec8d552d71dca52197f934e0a66b17e6364f1eed7a1d428e01","note":"Verifica offline: ed25519_verify(public_key, base64decode(signature_b64), canonical_json(payload))."}